EXAMPLE 3:
This example shows a Sub System Network with VAVMax and MiniMAX controllers where the IG01 is in
the middle of the run.
EXAMPLE 4:
This example shows a Sub System Network with VAVMax and MiniMAX controllers, with a repeater
where the repeater is in the middle of the run.
Figure 3-9:  Sub System Network with IG01 in the middle of a run
Figure 3-10:  Sub System Network with a Repeater in the middle of a run
Both ends of a run must have the EOL jumpers fitted, it does not have to be a primary device.
NOTE
Only one side of the repeater is in the middle of a run. The repeater has the EOL jumper fitted on port 1 but not on
port 2.